Project
Cessna Citation 525B ASIO installation
BIRD purchased a Cessna Citation 525B and modified it into a special mission platform with its ASIO (Airborne Surveillance, Intelligence and Observation) system.
I analyzed the radar unit, the EO pod and the mission units installed on the aircraft and the existing structure around them, from static analysis, through fatigue life, damage tolerance inspection intervals and static test validation, to certification.
What I did
- Delivered the certification stress reports for the installation
- Optimized the installation structure based on static, buckling and modal analysis results, increasing its stiffness and cutting its weight
- Validated my FEA model against the measured strains of the successful static test, with the strain gauge locations I chose
- Calculated the fatigue life of the installation from S-N curves
- Determined the inspection intervals with damage tolerance analysis in NASGRO
- Analyzed the metallic and composite installation parts and the surrounding existing structure for static loads and buckling
Result
I delivered the certification stress reports for the installation, and the aircraft went to the customer and flew with the ASIO system
Methods and tools
Radar unit






EO pod and units







